Five countries, ten entities, seven vendors – why someone has to own the decisions before the deadline
Ledarskap & beslut
Projektledning

A loyalty programme is never just an IT project

A leading operator in Northern Europe had outgrown the technical foundation of its loyalty programme. It wasn’t scalable, and needed to be rebuilt into a system landscape that worked regardless of country or booking platform. Five countries, ten legal entities, three new systems and seven vendors to coordinate – against a deadline the business itself couldn’t move: the solution had to be live before the next peak season.

On paper, this looks like a technical integration project. In practice, it’s decided by something else entirely: who gets to call it when seven vendors, several countries’ booking systems, and one shared group-wide target picture don’t agree.

Why more stakeholders rarely means faster decisions

The more countries, entities and vendors involved in a project, the more people have an opinion on scope, priority, and who absorbs the cost when something has to change. In theory that’s a strength – more perspectives, broader buy-in. In practice it often produces the opposite: any decision touching more than one market or vendor gets pushed along “for alignment,” and the timeline gets eaten by meetings where nobody actually owns the question.

With seven vendors delivering under different models – some traditional, some agile – and three new systems wired into six separate integrations against the existing landscape, there are hundreds of points where a decision can stall between two parties each waiting for the other to move first. Neither side is necessarily unwilling. They’re simply waiting for someone to own the call.

Owning the decisions, not just the plan

In this engagement, requirements and solution design were completed before a single vendor was approached: the scope, data requirements and integration flows for the new landscape – a loyalty platform, a centralised customer data platform, a marketing automation platform, and compatibility across multiple booking systems – were defined centrally. That gave every market and vendor one shared target to negotiate against, instead of each interpreting the scope on its own terms.

But the piece that actually held the project together wasn’t the plan itself. It was a central, coordinating role with an explicit mandate: not just to align business, IT and seven vendors, but to make sure the right decisions got made in time to hold the schedule. That’s a different job from running meetings. It means actively forcing resolutions that would otherwise stall between parties each waiting on the other – and doing it early enough that a delay in one country doesn’t ripple through the other nine entities’ timelines.

What owning the whole picture delivers

Six integrations between three new systems and the existing landscape were delivered across five countries and ten legal entities, inside the window set by peak season – without the project stalling in the kind of cross-border decision deadlock this type of engagement is otherwise prone to.

The takeaway: if your next project spans more than a handful of entities, countries or vendors, name one person – not a steering committee – who explicitly owns getting decisions made in time. The gap between “someone’s responsible for the plan” and “someone’s responsible for decisions actually getting made” is usually the gap between a deadline that holds and one that slips, country by country.

Everything starts with a good conversation

Ring Dan, Patrick, Christoffer eller Tobias eller använd formuläret nedan.

Dan: 070-729 80 25

Region Syd, Patrick: 070-963 24 56

Christoffer: 072-236 85 10

Tobias (Region Väst) 070-064 55 28

Tack. Vi svarar inom 24 timmar!
Oops! Something went wrong while submitting the form.